Bid-ready documentation
MasterSpec Section 32 17 13, ASTM C1782 compliance data, cylinder-test reports, and engineer-signed drawings — packaged for procurement.
Outcome: Faster approvals. Smoother procurement.
Bid-ready precast for public projects.
Public procurement requires complete documentation, defensible specifications, and a proven track record. Generic wheel stop suppliers slow projects down with incomplete submittals and unverifiable claims.
MasterSpec Section 32 17 13, ASTM C1782 compliance data, cylinder-test reports, and engineer-signed drawings — packaged for procurement.
Outcome: Faster approvals. Smoother procurement.
Steel-reinforced 4,000 PSI car and 6,000 PSI truck stops built to last in public-sector applications — reducing total cost of ownership.
Outcome: Better stewardship of taxpayer dollars.
No distributor layer. Procurement works directly with our production team for lead-time confirmation, custom configurations, and submittal review.
Outcome: Lower bid pricing. Faster answers.
| Model | Length | Height | Width | Weight | Best For |
|---|---|---|---|---|---|
| CB04 | 4′ (48") | 4" | 8" | ~130 lbs | Compact spaces |
| CB06 | 6′ (72") | 4" | 8" | ~195 lbs | Standard parking |
| CB08 | 8′ (96") | 4" | 8" | ~260 lbs | Wide / high-traffic |
| TB04 | 4′ | 6" | 10" | ~225 lbs | Light truck stops |
| TB06 | 6′ | 6" | 10" | ~335 lbs | Standard heavy-duty |
| TB08 | 8′ | 6" | 10" | ~450 lbs | Heavy-duty parking |
| TB08×12 | 8′ | 6" | 12" | ~535 lbs | Wider footprint |
| TB08 10×15 | 8′ | 10" | 15" | ~735 lbs | Maximum impact |
“APC provided complete specifications and bid documentation that streamlined our public works procurement. Long service life reduces our long-term maintenance costs significantly.”
Request a quote for your project. We respond within 1 business day with lead time and pricing.