TB08 · TB08×12 · TB08 10×15

Warehouses & Distribution Centers.

Truck-bumper profiles for loading-dock duty.

✓ Typical 4,500 PSI mix✓ Confirm operating conditions✓ Long industrial service life✓ Manufacturer-direct lead times✓ Bid-ready documentation
The Problem

Where standard stops fall short.

Standard car wheel stops crack under forklift traffic and need replacing repeatedly. Loading docks are revenue-critical — you can't afford downtime for replacements, OSHA citations, or building damage from failed equipment.

What This Means for You

Engineered for your environment. Measurable outcomes.

Match the operating conditions

APC uses a typical 4,500 PSI mix. Confirm the selected bumper profile, reinforcement and anchoring against the project requirements before use around forklifts or trucks.

Outcome: Fewer replacement purchases. Less maintenance downtime. Lower total spend.

Protects building & equipment

Review trailer positioning, equipment routes and the bumper layout with the project team. Confirm the accepted profile, anchoring and restrictions for the intended use.

Outcome: Fewer dock-face repairs. Lower insurance exposure.

Keeps you running

No failed equipment means no emergency re-orders, no rented replacements, no operations pausing for an avoidable cleanup.

Outcome: Faster loading cycles. Better operational efficiency.

Product Recommendations

Right stop. Right zone.

Loading docks
TB08 / TB08×12
10–12 ft stops for trailer alignment
Forklift staging zones
TB06 / TB08
6 or 8 ft heavy-duty truck stops
Industrial truck parking
TB08 10×15
Maximum mass and impact resistance
Yard organization
TB06
Standard heavy-duty stops
ModelLengthHeightWidthWeightBest For
TB044′8"10"283 lbsLight truck stops
TB066′8"10"425 lbsStandard heavy-duty
TB088′8"10"566 lbsHeavy-duty parking
TB08×128′6"12"~535 lbsWider footprint
TB08 10×158′10"15"~735 lbsMaximum impact

“Installed APC's TB08×12 heavy-duty stops eight years ago — they still look perfect. The upfront cost paid for itself in avoided replacements.”

— Operations Manager, Distribution Center
Get a Quote

Spec out your facility.

Request a quote for your project. We respond within 1 business day with lead time and pricing.